Main Technical Parameters |
|
Model |
AW-C |
|
Max.Bag Making Width |
200-580mm |
|
Bag Making Thickness Range |
35-100g |
|
Max.Bag Making Length |
100-800mm |
|
Production Speed |
40-90pcs/min |
|
Total Power |
18kw |
|
Machine Weight |
4t |
|
Overall Demensions |
12000*2300*2000mm |
|
|
|
|
|
|
|
|
1) Main motor with frequency conversion(made in Shanghai), speed can be adjusted |
|
2) Micro-computer controlled stepping motor |
|
3) Pneumatic shaft axis |
|
4) EPC(edge position control) controls material running |
|
5) Side-folding,heating with electrical temperature-controlled |
|
6) Material half-fold,with EPC control |
|
7) Tachometer shows as the material runs |
|
8) Adjusted lever with air cylinder tension control |
|
9) Ultrasonic made in Jiangsu,Japan Chip,YDN Brand |
|
10) Photocell tracks the printing material |
|
|
|
|
|
|
|
|
Spare parts for free: |
|
1)Solid relay,1 piece |
|
2) Resistor (EPC),1 piece |
|
3)Capacitor(EPC),1 piece |
|
4) Big spring,2 pieces |
|
5) Photocell sensor(EPC),1 pieces |
|
6) Proximity switch,2 pieces |
|
7) Travel Switch,2 pieces |
|
8) Electric couple,2 pieces |
|
9) Ultrasonic fan,2 pieces |
|
10)Normal switch,2 pieces |
|
11)Speed controlle,1 piece |
|
12)PET,1 piece |
|
13)Magnetic valve,1 piece |
|
14)Displacement switch,2 pieces |
|
15)Tepper motor belt,1 piece |
|
16)Crew of lace roller,10 pieces |
|
17)Heating tuberew of lace roller,4 pieces |
|
|
|
|
|
|
|
|
|
|
Terms of payment: 30% T/T in advance,the balance should be paid before the delivery |
|
|
Delivery time: Within 25 days after receiving the 30% deposit before the shipment |
|
Quotation valid period: 30 days |
|
Guarantee period and maintenance: Seller guarantees that the equipment is accordance with the function and requirement without manufacturing defects. The guarantee period is one year after the installation and adjustment. Buyer is responsible for the costs including maintenance and spare parts if the equipment damage is caused by the buyer's improper use, not caused by the seller's design and manufacturing. If the buyer needs seller to send an engineer the installation and training.The buyer should cover the all of expense for the seller's engineers, such as, air-tickets,visa,accommodation and local traffic charges,salary(USD 100/day) in buyer's side.And the buyer should do his best to cooperate the engineers of sales party in installation, supply the enough labor and tools, necessary accessory with them. |
|